44               l Introduction l  Nature of Business  l  Organisation and Shareholding Structure  l  Business Review  l  Corporate Governance  l  Financial Statements  l  Other Information  l





            There are three main components in BTSC civil works.                      a prefabricated concrete structure assembled together by an Internal Tendon
                                                                                      system installed at the site and in-place casting system. I-Girder is placed at
            (i) Pier Column                                                           the location of the main beam to serve as support for the laying of both the
            The pier column for the entire project is laid on foundations, both in the form   ticketing floor and the platform floor. Most of I-Girder is moulded at the factory
            of bored piers and barrette piles, which are drilled into the ground to a depth   and moved to the job site for installation. Inspection of the station structure
            of about 60 metres. The pillars are reinforced concrete structures.       with structural cracks are checked every 6 months.


            Structural subsidence is examined by survey data collection and comparison   (iv) Track & Conductor Rail
            in every 5 years. Each column has a benchmark level in order to conduct   BTS track is a non-ballast double tracks with a width of 1.435 metres (Standard
            a level camera survey according to the designer’s requirements. There is also   gauge). The track type is 60 E1 (UIC60) with dimensions and shapes according
            a check for any cracks occurring at the column structure every 6 months.  to EN13674-1 and weighs approximately 60 kg/metre. A conductor rail in
                                                                                      the BTS SkyTrain system is a third rail located a distance of 1.4 metre from the

            (ii) The Structure of the Runway Bridge (Viaduct)                         centre of the runway along the length of the route in both directions. It is
            There are 2 types of viaduct; Precast Segment Box Girder System and Cast in   an aluminium rail which has a stainless-steel contact, thickness of 6 mm and
            Place System. The Precast Segment Box Girder System uses precast concrete   weighs about 17 kg/metre. BTSC has in place both interval preventive and
            parts from the factory and then transports them to install at the site. They   corrective maintenances for track and conductor rail depends on work task.
            are sequenced, fastened to each other by the External Tendon system. Also,
            the Pier Segment is placed on both sides of the Pier Column, which is the   3.2 Electrical and Mechanical Works
            load taken from Anchorages. For the Cast in Place System, is a structure that   (i) Rolling Stock
            requires periodic casting of concrete at the work site. The cast structure is   Green Line rolling stock
            fixed in place with the Internal Tendon system. This type of structure can be   Initially, BTSC owned a total of 35 trains, all manufactured by the Siemens
            found in the structure with a length of more than 30 metres and in the Silom   Group. Specifically designed to suit the use and conditions in Bangkok, the
            Extension Line from Saphan Taksin - Bang Wa.                              35 trains consisted of three-car trains, with a total capacity to carry up to
                                                                                      1,106 passengers (126 sitting and 980 standing), whereas the BTS Sky Train
            There is an internal inspection of the bridge structure (inside viaduct) in   station has the capacity to take a train with up to six-car trains. The trains
            every 5 years. The inspector checks the support points for the runway bridge   run on AC motors, receiving electricity from the third rail system. The average
            (Bearing pad/Pot Bearing), the Anchor, the Tendon and the cracks of concrete   train speed in service is approximately 35 kilometers per hour (including time
            Segment Box Girder.                                                       for passengers boarding the trains), with a maximum speed of 80 kilometers
                                                                                      per hour. Every car train is equipped with 42 seats along its length and 2
            (iii) Main Station Structure                                              air-conditioning units. The car trains are connected by a walkway to allow
            There are 2 beam structures which are the main beam (Cross Beam) and      passengers to walk between the car train. The wheels are equipped with the
            sub-beam (I-Girder). The Cross Beam is placed at the column position and is   damping ring in order to reduce the noise level.